• Reliable CE Beverage Filling Machine , Liquid Bottle Filler PLC + Touch Screen
  • Reliable CE Beverage Filling Machine , Liquid Bottle Filler PLC + Touch Screen
Reliable CE Beverage Filling Machine , Liquid Bottle Filler PLC + Touch Screen

Reliable CE Beverage Filling Machine , Liquid Bottle Filler PLC + Touch Screen

Product Details:

Place of Origin: Jiangsu, China(Mainland)
Brand Name: Reliable
Certification: CE ISO SGS
Model Number: CGFR12-12-6

Payment & Shipping Terms:

Minimum Order Quantity: 1set
Price: USD17000/Set
Packaging Details: Wooden Case
Delivery Time: 15~30work days
Payment Terms: L/C, T/T, Western Union, MoneyGram
Supply Ability: 10Sets/Month
Get Best Price Contact Now

Detail Information

Machine Material: SUS304 Capacity: 4000 Bottles Per Hour
Weight: 2200KG Power: 3.5KW
Control System: PLC+Touch Screen Service: Bottle Design
High Light:

beverage bottling equipment

,

beverage filling equipment

Product Description

 

Reliable CE Beverage Filling Machine , Liquid Bottle Filler PLC + Touch Screen

INTRODUCTION

The juice beverage filling machine integrates washing, filling and sealing into one hot filling machine, which is suitable for various juice beverage filling production, tea beverage filling production, milk beverage filling production, blueberry juice production. , kiwi juice filling production, pear juice filling production, grape juice filling production, apple juice filling production, orange juice filling production; at the same time replacing a small number of parts, can be used for pure water filling line, mineral water irrigation Loading production line. The output is 4000-24000 bottles/hour, which is available for users to choose. The automatic juice hot filling machine adopts the advanced micro-negative pressure gravity filling principle, which is fast, stable and accurate. It has a complete material return system, and can also achieve independent return air during reflow, no contact with materials, and reduce secondary pollution of materials. And oxidation.

1.Washing Part: It is mainly composed of a bottle head, an upper disc and a guide rail.The bottle head rotates with the upper disc, and the bottle neck clamp is used to clamp the filling bottleneck, and the rail is flipped by one hundred and eighty degrees, rinsed and dripped, then flip 180°.

2.Filling Part: It mainly consists of water tank, filling valve, guide rail and card bottle lifting device.The No. 2 card bottle plate is fed into the filling machine, the bottle bottle plate is filled to hold the bottle neck, rotates with the water tank, etc., and the filling valve is opened by sliding on the guide bar according to the guide rail, and the filling valve is lowered after the filling is completed.Filling valve, filling valve closes by itself. The bottle is sent out of the filling machine with the No. 3 card bottle.

 
3.Capping Part: The capping mechanism is composed of three parts: a capper, a capping machine and a capper.The bottle is fed by the No. 3 card bottle plate, the card cover is completed, and the cap plate is sent out by the No. 4 card bottle plate.

 

 

Parameter

Model No
CGFR12-12-6
CGFR18-18-6
CGFR24-24-8
CGFR32-32-8
CGFR40-40-10
Washing No
12
18
24
32
40
Filling No
12
18
24
32
40
Capping No
6
6
8
8
10
Capacity
3000-4000BPH
6000-7000BPH
8500-12000BPH
12000-15000BPH
16000-18000BPH
Power(KW)
2
3.5
4
4.8
7.6
Weight(KG)
2600
3500
4650
6800
8500
Measure
L*W*H(mm)
2400*1750*2500
2500*1860*2550
3100*2100*2550
3800*3000*2850
4650*3300*3400
Application
Drinking Water,Pure Water,Mineral Water,Spring Water and so on.
User Ambient Conditions
Temperature:10~40℃;Humidity:No dew

 

 

FAQ

1.Q:Are you a factory or trading company?
A:We are a factory, professional water treatment equipment manufacturer and small bottle water production line with over 30 years experience. Factory Our Company covers total area of 45000㎡. There have been more than 80 countries use our products.

2.Q:Where is your factory located? How can I visit there?
A:Our factory is located in 8th Tongde Road,Zhaofeng Industry zoom, Leyu Town, Zhangjiagang City,Jiangsu Province,China. about 2 hours away from podong Airport .we will pick you up in the nearest station. All our clients, from home or abroad, are warmly welcome to visit us !

3.Q:How long is the warranty of your equipment?
A:2 years warranty after receipt check upon delivery. And we will comprehensively provide you all kinds of technical support services in after-sale !

4.Q:What is the features of our company?
A: We provide turnkey project for customers, including pre-sale and after-sale service; complete production line equipment supply; bottle design; layout programs provide; or provide auxiliary materials purchasing agent supplier information; equipment overseas installation and commissioning; operator training; etc.

 

Reliable CE Beverage Filling Machine , Liquid Bottle Filler PLC + Touch Screen 0

Want to Know more details about this product
I am interested in Reliable CE Beverage Filling Machine , Liquid Bottle Filler PLC + Touch Screen could you send me more details such as type, size, quantity, material, etc.
Thanks!
Waiting for your reply.